Pressure hose, Final assembly, Operation – MTD 249-620-003 User Manual

Page 8: Initial preparation, Note

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Pressure

Hose

Control

Valve

Pressure Hose

The pressure hose is attached to the top of the pump.

-Route the hose as shown in figure 10. Place the metal

pressure tube in position on the fitting on top of con-

troi valve. Secure with the compression nut on the

pressure tube, using an adjustable wrench.

FINAL ASSEMBLY

1. Make certain all nuts, bolts and hose clamps are

tightened securely.

2. Before operating the log splitter, make certain to

follow the “Initial Preparation” instructions in the
Operation Section.

FIGURE 10.

OPERATION

INITIAL PREPARATION

1. Place log splitter on a firm, level surface. Fo' ver­

tical operation, remove the quick release pin from
the latch bracket. Place the beam in the vertical
position. Place the quick release pin througi the
holes in the beam mounting plates anc the
brackets on the reservoir tank. See figure ' 1.

FIGURE 11.

2. Service engine with gasoline and oil as instructed

in the separate engine manual packed with your
log splitter.

3. Lubricate the beam area where splitting wedg e will

slide with engine oil (DO NOT USE GREASE).

Make certain to oil both front and back of the beam

face.

4. Fill the reservoir tank as follows.

a. Remove reservoir vent plug. See figur<i 11.

Using Dexron II automatic transmission fluid,

fill reservoir to the top. Replace vent plug
securely.

b. Disconnect the spark plug wire.

Prime the

pump by pulling the recoil starter, to turn the
engine over, approximately 10 times.

Recon­

nect the spark plug wire.

c. Start engine. Use the control handle to extend

the wedge to the far extended position. Leave
the wedge in this position (do not retract).

d. Refill tank to within 1V

2" to 2" from the top of

the tank. Total capacity of system is approx­
imately 7.6 gallons.

e. Now retract the wedge. Extend and retract the

wedge fully 10 to 12 complete cycles to remove
trapped air in the system (system is “self­

bleeding”).

f.

Refill the reservoir

to within 1 Vz" to 2" from

the top of the tank. Much of the original fluid

has been drawn into the cylinder and hoses.
Make certain to refill the reservoir, to prevent

extreme damage to the hydraulic pump. Failure
to refill the tank will

void your warranty.

NOTE

Some fluid may overflow from the
vent plug as the system builds heat
and the fluid expands and seeks its
own level.

A

WARNING

Do not operate the log splitter without

the

proper

amount

of

transmission

fuild in the reservoir tank.

Advertising