Operation, Preparation – Nespresso Essenza FS EF 474 User Manual

Page 8

Advertising
background image

8

Service Manual EF 473 / EF 474

en

Version 1.0

Operation

Preparation

1. Fill tank with water.
2. Insert water tank in coffee machine.
3. Switch on machine with On/Off switch.
4. Position receptacle with a capacity of

min.100 ml under coffee outlet.

)

Do not insert a capsule yet.

5. Wait until machine is ready (both buttons

are lighted).

6. Press button "small cup" or "large cup" to

rinse coffee outlet.

7. Press the same button again in case the

receptacle is filled.

1

2

6

3

4

5

7

Advertising
This manual is related to the following products: