Procedure (continued) – Da-Lite Da-Lift Pivot Motorized Projector Lift User Manual

Page 6

Advertising
background image

6

Procedure (Continued)

10. Power the projector and adjust projector location.

11. Remove Ceiling Tile Holder Cap from Da-Lift. Install Ceiling Tile

cutout from step 6 into Ceiling Tile Holder and assemble Ceiling
Tile Holder Cap. See Figure 12.

12. Install Trim Piece onto Da-Lift. See Figure 13. You may need to

adjust the position of the Ceiling Tile Holder to clear the Trim.

13. Use provided Cable Ties for cable management. See Figure 14.

Allow enough slack in the cords for projector movement.
If Da-Lift is a 220V version, use the supplied electrical adapter.

14. Use a licensed electrician to wire the Da-Lift. See Figure 15 (120

volt) or Figure 16 (220 volt). Plug the power supply into the
receptacle of the Da-Lift.

Figure 13

Figure 12

Ceiling Tile

Holder Cap

Ceiling Tile

Trim

Figure 14

Cable Tie

Holes

A

Cable Storage

Figure 15

Figure 16

220V AC

50Hz Supply

Hot

Common

Ground

Recommended Wire Size: 12AWG

Brown (Hot)

Blue (Common)

Green (Ground)

120V AC

60Hz

Supply

Hot

Common

Ground

Recommended Wire Size: 12AWG

Black (Hot)

White (Common)
Green (Ground)

Advertising