7 fixing jig pack – Glow-worm 23c User Manual

Page 13

Advertising
background image

13

2000225000B

7 Fixing Jig Pack

The fixing jig is made up as follows:
A - Heating return fitting with isolating valve (v).
B - Cold water inlet fitting with isolating valve (m).
The cold water inlet restrictor supplied with boiler is
fitted when the boiler is installed. Refer to Section 9.
C - Heating flow fitting with isolating valve (q).
D - Domestic hot water outlet.
E - Gas fitting.

Diagram 7.1

A

B

C

D

E

COPPER
CONNECTIONS
AND WASHERS
(5 OFF)

F

m

v

THE FIXING JIG
SHOWN ASSEMBLED

Other components within the fixing jig pack.
F - Hanging bracket
G - wall template
H - copper connections
J - sealing washers and screws

RIGHT
HAND
SUPPORT
BRACKET

LEFT
HAND
SUPPORT
BRACKET

ISOLATING
VALVE
PLATE

SCREW

9897

q

9717

G

J

H

1 Heating systems connections
- Pipe diameter 22mm
2 Hot water system connections
- Pipe diameter 15mm
3 Gas connection
- Pipe diameter 15mm

H

Advertising