7 flue preparation – Glow-worm Energy Saver 80 - 100 and Gave Valve User Manual

Page 16

Advertising
background image

16

221564F

7.6 Flue Attachment To Boiler

Refer to section 8 and fix the boiler in position prior to completing
the flue installation.

Pull off the wire clip on the flue adaptor pipe inside the boiler, see
diagram 7.5. Push the flue adaptor pipe downwards into the flue
pipe.

Refer to diagram 7.4. Fit rubber dome ‘J’ to the base of the flue
elbow ‘G’ and place securing ring ‘H’ over the elbow to rest
around the bottom flange of the rubber dome.

Fit flue elbow ‘G’ to air pipe ‘B’ and flue duct ‘A’. A small amount
of lubricant can be applied to the rubber seals in the elbow to
facilitate this.

Secure the rubber dome ‘J’ to the top of the boiler with securing
ring ‘H’ and screws provided.

Push the flue adapter pipe up onto the inner duct of the elbow
and secure with wire clip.

Diagram 7.4

6507

Diagram 7.5

6551

GROOVE

TAB

‘A’

‘B’

‘G’

‘H’

‘J’

‘D’

‘E’

‘F’

SCREW

(4 OFF)

‘C’

LABEL

FLUE
ADAPTOR

PIPE

WIRE CLIP

GROOVE

BOILER FLUE
OUTLET PIPE

7 Flue Preparation

Advertising