4 Installation

5 Casing Location / Fitting

4.7 Boiler Connection

Connect the boiler to the system pipework.

Make the gas connection to the service cock, at the lower right
hand side of the boiler.

5.1 Vent Grille

One vent grille is supplied with the boiler, which can be fitted at
the rear of the left or right hand side casing. The grille is fitted
on the opposite side to any pipework connections.

Fit the grille, if required, to the side panel where no water pipes
are connected, as shown in diagram 5.1 prior to fixing the side
panel. The plastic pegs are a tight fit and are best pushed home
with a flat faced tool.

Discard the grille if the water connections are made on both
sides of the boiler or if the boiler is screened by fixtures.

Diagram 4.7

REAR CONNECTION
PIPEWORK (28mm)

1525

57 MAX.
(2

1

/

4

in.)

VIEW ON
ARROW 'B'

'B'

BOILER

57 MAX.
(2

1

/

4

in.)

FOR
MINIMUM
CLEARANCE

Diagram 4.8

TERMINAL AND AIR DUCT -
STANDARD OR SHORT

0877

INNER BAFFLE/
FLUE DUCT
ASSEMBLY

AIR DUCT
ASSEMBLY

OUTER
BAFFLE

WIRE
GUARDS

SCREW (4)

BOILER
AIR DUCT

WALL
PLATE

5.2 Side Casings

Fit the side casings by locating their lugs into the appropriate
slot in the boiler plinth, see diagram 5.2, depending on the
required height, see Section 1.7

Secure the casing sides to the front upper brackets.