8 servicing – Glow-worm Hideaway 60BF User Manual

Page 18

Advertising
background image

18

221693B

8 Servicing

Diagram 8.6

FLUEWAY
BAFFLE

HEAT
EXCHANGERS

6122

HEAT
EXCHANGERS

FLUE
BAFFLE

FLUEWAY
BAFFLE

Diagram 8.5

6308

8.2 Burner and Injector

Follow instructions to remove the cover, burner and controls
assembly as in Section 8.1.

Remove the two screws and nuts securing the burner support
bracket to the combustion chamber cover, see diagram 8.7.

Remove the graphite coated nuts on the supply feed pipe at the
rear of the burner to release the burner, take care not to damage
the pilot burner and shield when removing.

Clean burner thoroughly.

Check the main burner injector for blockage or damage and
replace if necessary, see Section 9.2 and diagram 8.8.

8.3 Service Checks

Inspect the pilot burner, thermocouple and clean or replace as
necessary. If necessary remove the pilot shield by removing the
securing screw and nut.

Check the condition of the side and rear insulation panels in the
combustion chamber.

Check the condition of the seals on the cleaning door and the
combustion chamber cover.

Replace all items in the reverse order, relight and test the boiler.

BURNER SERVICING

Diagram 8.8

Diagram 8.7

REMOVAL OF BURNER FROM
COMBUSTION CHAMBER /
SUPPLY FEED PIPE

6310

6309

WASHER

COMBUSTION
CHAMBER
COVER

MAIN
BURNER

BURNER
SUPPLY
PIPE

GRAPHITE
COATED
NUT (2)

SCREW (2)

BURNER
SUPPORT
BRACKET

MAIN
INJECTOR

BURNER

SECURING
NUT

BURNER
END CAP

Advertising