All the drawings dimensions are shown in mm.

6 Appliance location

6.1

Location

6.1.1

Instructions

Before choosing a site for the appliance, carefully read the

safety warnings and installation manual.

• Ensure that wall to which the appliance will be mounted on is

structurally safe in order to support the weight of the appliance.

• Ensure that the space that the appliance is to be installed

within allows the appliance to be installed and the clearances

maintained. This will ensure that the connections to the

water, gas and flue can be accessed and inspected (see

chapter Clearances).

• Explain these requirements to the appliance user.

• Do not install the appliance above another appliance that

could damage it (for example, above a cooker that might

emit steam or grease) or in a room, which has a lot of dust in

the atmosphere which is corrosive.

• The boiler must be fitted inside the property and exposed

pipe work may need to be protected from frost by fitting a

frost thermostat.

6.1.2

Regulations

Location

This boiler is not suitable for outdoor installation.

This boiler may be installed in any room, although particular

attention is drawn to the installation of a boiler in a room

containing a bath or shower where reference must be made to

the relevant requirements.

This boiler is suitable for installation in bathroom zones 2 and 3.

In Gb this is the current I.E.E. WIRING REGULATIONS and

BUILDING REGULATIONS.

In IE reference should be made to the current edition of I.S.813

“Domestic Gas Installations” and the current ETCI rules.

Timber Frame Buildings

If the boiler is to be installed in a timber frame building it should

be fitted in accordance with the Institute of Gas Engineers

document IGE/UP/7/1998. If in doubt seek advice from local

gas undertaking or Glow-worm.

6.2

Clearances

• To allow periodic maintenance, ensure the distances

indicated on the diagram.

Additional clearances may be beneficial around the boiler for

installation and servicing.

For flue installations where external access is not practicable,

consideration should be given for the space required to insert

the flue from inside the property, which may necessitate

clearance larger than those specified in diagram below.

ØA

ØA + 5 min.

600*

min.

0

min.

0

min.

200

min.

150

min.

Key

*

A removable compartment door can be placed a minimum 5

mm in front of appliance. A clearance of 600 mm is required

from a fixed surface.

The boiler and flue are suitable for installation onto and through

combustible materials provided that:

- Minimum 5mm clearance is maintained around the

circumference of the flue (air intake).

- The combustible surface and fixings are suitable for

supporting the load.

- The minimum clearances from the boiler case are

maintained.

6.3

Ventilation

6.3.1

Room Ventilation

The boiler is room sealed so a permanent air vent is not required.

6.3.2

Cupboard or Compartment Ventilation

Due to the high efficiency and low casing temperature of this

boiler, cupboard or compartment ventilation is not necessary.

• Existing ventilation should be investigated for its purpose

before removing.