Golden Blount LFP4218TV Linear Fireplace User Manual

Page 8

Advertising
background image

Finishing the Wall

Finish the wall with the material
of your choice. Do not install a
combustible mantle or other
combustible projection above the
fireplace opening unless it is a
minimum of 12 inches above top
of fireplace opening. (Figure 8.2)

CAUTION: All joints between the finished wall and the fireplace surround (Top and
Sides) can only be sealed with non-combustible material. Only non-combustible
material can be applied as facing to the fireplace surround. (Figure 8.2)

Hearth Extension

A Hearth Extension may be installed. But it is not required for vented gas fireplaces.

Glass Installation

1. Model LFP4218 is supplied with 15 lbs of fireglass that is used to fill fireplace burner

tray and be distributed around the surrounding floor area of the fireplace.

2. Fill burner tray with glass even with or slightly above floor of fireplace. (Figure 9.1).
3. Distribute remaining glass around front, sides and rear of burner tray covering floor

area. (Figure 9.2)

8

STUD

2X4
HEADER

FINISHED
WALL

NON-COMBUSTIBLE

SEAL JOINT

MANTLE

12" MIN

TOP OF
OPENING

Figure 8.2

CONTROL
KNOB

DUCT
TERMINATION

RAIN CAP

CAULKING

WALL

OUTER
CASING

DUCT
COLLAR

Figure 8.1

Connecting the Gas Line

Consult local building codes before gas line installation. This gas fireplace is designed
to accept a 3/8" male flare fitting attached to a 1/2" supply line. Have the gas line
installed by a qualified service person in accordance with all building codes. Install gas
line to fireplace on the right side attaching gas line to the gas flex line inside the control
box accessed by opening the control box door.

Advertising