Hanna Instruments PCA 310 User Manual

Page 70

Advertising
background image

70

Allow sulfuric acid to stand in the measuring cell for 15 min-
utes to dissolve any foreign materials adhering to the cell walls.
Wipe the cell interior with a cotton-tipped swab. After wiping,
open the drain port to empty the measuring cell from the clean-
ing solution.

CHANGING MEASURMENT CELL

To change the measuring cell (#7 page 10) with a new one
(HI 70487) in the PCA310 - 330 analyzers, follow the steps:
•

Stop the analyser by turning off the main switch.

•

Remove the reagent and buffer bottles to free space.

•

Disconnect the reagent and buffer tubes from the cell
body.

•

Disconnect the sample inlet tube from the cell body. This
tube is between electrovalve (#21 pag 10) and cell.

•

Disconnect the drain tube (#8 on page 10) from the cell.

•

Unplug the cell connector.

•

Unscrew the cell from its support by using hexagonal
wrench.

•

Put the new cell in its place and screw it in position. Take
care to position the electrical cable first.

•

Reconnect the electrical wires and the pneumatic circuit
as it was at the dismounted cell.

•

Power on the PCA310 - 330 analyzer.

•

Go to menu mode “Chlorine Menu” - “Cal measuring
Cell” and start the “Calibration Blank” function.

•

Confirm by pressing “CFM” when asked “Start the blank
calibration?”.

•

Wait for the end of the procedure.

•

If the message Press CFM appears, the procedure was
successful and Pressing “CFM” will save the coeficients
for the new cell.

•

If the message “failed” appears, the cell is not working
properly. Check the electrical cable connection and if the
error persist call Hanna Service.

•

Prime the reagent pump - see page 36 for details.

•

Wait 3 cycles for the measurement to stabilize.

•

Calibrate the measuring cell as described at page 40.

Note:

Before start measuring assure that a stirring bar (HI 70487)

is present in the cell.

Advertising
This manual is related to the following products: