Labconco PuriCare Procedure Stations 31261 Series User Manual

Page 12

Advertising
background image

Product Service 1-800-522-7658

6

Original instructions












C

C

h

h

a

a

p

p

t

t

e

e

r

r

3

3

:

:

G

G

e

e

t

t

t

t

i

i

n

n

g

g

S

S

t

t

a

a

r

r

t

t

e

e

d

d

Now that the installation is properly prepared, you are ready to inspect,
install, and certify the PuriCare Procedure Station. This chapter covers how
to:

• Unpack and move the Procedure Station.

• Install the cabinet.

• Connect the electrical supply source.

• Connect the service lines.

• Connect to an exhaust system (optional).

• Arrange certification of the Procedure Station.

Tools required for installation the procedure station include two 1/2"
wrenches, a flat-blade screwdriver, a #2 Phillips screwdriver, and a
carpenter’s level.

Note: The Procedure Station models weigh between 400–700 lbs. (182-318
kg). The shipping pallet allows for lifting with a mechanical lift truck or
floor jack. If you must lift the product manually, use at least six (6) persons
and follow safe-lifting guidelines.

Advertising