Setting up your clear stoppering chamber – Labconco FreeZone Clear Stoppering Chambers User Manual

Page 15

Advertising
background image

11

Chapter 3: Getting Started

Product Service: Domestic 1-800-522-7658, International 816-333-8811

Setting Up Your Clear Stoppering
Chamber


After you verify receipt of the proper components, move your
Clear Stoppering Chamber to the location where you want to
install it. Then, follow the steps listed below.

Installing the Clear Stoppering Chamber
on the Freeze Dry System

1. Place the rubber gasket over the 3” port on the top of the

Freeze Dry System.

2. Position the Shelf Assembly over the 3” port. Rotate the

Shelf assembly so it clears the lid over the collector.

3. Place the clear chamber over the shelves.

4. Position the Stoppering Assembly on top of the chamber.

Make sure the tab on the bottom plate is not positioned
directly above the pin on the shelf assembly top plate.

Rotate the entire stoppering assembly clockwise until all
3 tabs with slots fully engage the 3 rods.

5. Position the Power Supply on the top of the Freeze Dry

System and then connect the harness from the Shelf
Assembly to the Power Supply.















)

Advertising