Laerdal recommends, Replacing skin and veins – Laerdal Multi-Venous IV Training Arms User Manual
Page 5
Advertising
![background image](/manuals/738843/5/background.png)
latex vein.
3. Allow fluid to flow through
arm and out other vein.
4. Clamp off flow of water.
The arm is now ready to
practice venipuncture.
Laerdal Recommends:
When excessive leaking occurs at puncture sites, either a new vein
system or skin should be installed to reduce loss of fluid.
We recommend working at a sink when replacing the skin and vein
system.
Replacing Skin and Veins:
1. Remove skin:
If replacing skin and veins, cut off skin. This can be done
with a sharp knife, scalpel or scissors. (Figure 1) When
finished, discard skin. (Figure 2)
Fig. 1
375-50001 Laerdal
5
Advertising