Mounting the first opener, Installing the second opener, Step 11 – Mighty Mule FM502 Dual Swing - Blue Board User Manual

Page 20: Step 12

Advertising
background image

16

Mounting the First Opener

Step 11

Attach the opener to the securely bolted post bracket assembly and gate bracket using clevis pins, bushings, and hairpin
clips, or optional Pin Locks (see Accessory Catalog). Verify that the opener is level and adjust the post bracket assembly if
necessary.

Level Opener

Gate In Open Position

LEVEL horizontal cross member

Post Bracket Assembly

bolted to fence post

Clevis Pin, Bushing, and Hairpin Clip

Clevis Pin, Bushing, and Hairpin Clip

Gate Bracket bolted

to gate cross member

Fence Post

Installing the Second Opener

Step 12

Install the second opener on the remaining gate leaf by repeating Step 3 through Step 11, starting on page 13.
After you have mounted the second opener, proceed to Installing the Positive Stops on the next page.

Advertising