TFC Group STTR/F User Manual

Page 10

Advertising
background image

Mounting the Receiver onto the optional wall
box:

1. Remove the front cover of the Receiver
2. Mark the holes position for the wall box
3. Drill two holes and insert the wall plugs until

they are flush with the wall surface

4. Pull the wires into the wall box and fasten the

wall box onto the wall

5. Connect the wires (see wiring diagram)
6. Securely fasten the Receiver to the wall box

with the two machine screws provided

7. Replace the front cover and installation is

complete.


Wiring for 230v or volt-free applications

The Receiver has a volt-free contact, but comes
from the factory with a pre-wired red link wire which
puts volts onto the switch. Leave the link in place
for mains switching, or remove the link for volt-free
switching.












Connections for mains switched load:

Leave the link wire in place, and connect the

switched-live input of the load to the normally

open contact (marked SL (on))

input of the

load to the normally open contact (marked

Connections for volt-free switching:

Remove the link wire. Connect the looped

terminals of the boiler between common (marked L

in) and normally open contact (marked SL (on))

Live

supply

Neutral supply

Live output

230V

Leave red
link wire
in place

Live from load

Switched live output

Live supply

Neutral supply

Remove
red link
wire

Advertising