Venting installation, Continued, Using elbow offsets (30e-8dm) – Desa S36R User Manual

Page 7

Advertising
background image

www.desatech.com

111026-01C

7

Venting inStallatiOn

Continued

Continue to assemble chimney sections as outlined,

making sure that both the inner and outer pipe sec-

tions are locked together. When installing double

wall snap-lock chimney together, it is important

to assure the joint between the chimney sections

is locked. Check by pulling chimney upward after

locking. The chimney will not come apart if prop-

erly locked. It is not necessary to add screws to

keep the chimney together (exception - see Figure

9, page 8).

USING ELBOW OFFSETS (30E-8DM)

1. To achieve desired offset, you may install

combinations of 12", 18", 24", 36" and 48"

length of double wall pipe (see offset chart

and Figure 7).

2. Chimney weight above offset rests on return

elbow. Straps must be securely nailed to rafters

or joists (see Figure 8, details a & b on page 8).

3. Maximum length of pipe between supports

(return elbow or 12S-8DM) is 6' of angle run.

Maximum of two 6' angle run sections per

chimney system (see Figure 7).

4. All pipe connections between the offset and

return must be secured with two screws on the

outer pipe only (see Figure 9, page 8). Do not

penetrate the inner stainless.

OFFSET

RISE

CHIMNEY LENGTH

A

B

48"

36"

24"

18"

12"

4

3

/

8

"

16

3

/

8

"

ELBOW SET ONLY

9

3

/

4

"

2

1

/

2

"

1

12

3

/

4

" 30

3

/

4

"

1

1"

34

3

/

4

"

1

18"

40"

1

1

21

1

/

4

" 46

1

/

4

"

1

23

3

/

4

" 49

1

/

4

"

1

1

27

3

/

4

" 6

3

/

4

"

1

30"

60

3

/

4

"

1

1

33"

66"

1

1

36"

71"

1

1

38

1

/

4

"

7"

2

41

1

/

4

" 80

1

/

4

"

1

1

1

4"

86

3

/

4

"

2

46

3

/

4

" 89

1

/

2

"

1

1

1

1"

97"

1

1

3

1

/

4

"

101"

2

1

6

1

/

4

" 106

1

/

4

"

2

9

1

/

4

" 111

1

/

2

"

1

1

1

61

3

/

4

" 11

1

/

2

"

2

1

64

3

/

4

" 120

3

/

4

"

2

1

68

1

/

4

"

127"

1

2

70"

130"

2

1

1

74

1

/

4

" 137

1

/

2

"

1

2

1

76

3

/

4

" 141

1

/

2

"

1

2

1

79

3

/

4

" 146

3

/

4

"

4

OFFSET CHART (22-50 FT. SYSTEM HEIGHT)

Figure 7 - Typical Offset Terminations

Return
Elbow

Offset
Elbow

Return
Elbow

Offset
Elbow

6' Max.

6' Max.

6' Max.

6' Max.

6' Max.

6' Max.

Return
Elbow

Offset
Elbow

Offset
Elbow

Return
Elbow

A

B

C

Offset
Elbow

Ceiling
Support Pipe
12S-8DM

Return
Elbow

Advertising
This manual is related to the following products: