Assembly, Preparing the setup, Order of assembly – d&b Z5396 Y Base plate User Manual

Page 5: Y8/y12 ground stack

Advertising
background image

WARNING!
Potential risk of personal injury and/or

damage to material!

Always secure ground stacked setups against movement and

possible tipping over.
Observe the maximum number of cabinets permitted. This is

particularly important when setting up mixed ground stacks.

2.1. Preparing the setup

General
Check the acoustical and mechanical setup using ArrayCalc and

prepare enough printouts for each array.
When on site first:

Clear the working areas and ensure there is enough space to

set up the ground stack.

Prepare the cables and link cables according to the number of

amplifier channels and cabinets used.

Inspections before setup
Before setup carry out a visual inspection of all system components

for faults. This also includes the loudspeakers and in particular the

rigging parts of the cabinets (Front and Splay/Rear links).

Damaged components must be withdrawn from use immediately.

Please follow the instructions given in Þ Chapter 3. "Care and

maintenance" on page 8.

2.2. Order of assembly

2.2.1. Y8/Y12 Ground stack
1. Attach the first cabinet to the Base plate
1. Place the Base plate on the ground.
2. Place the first cabinet onto the Base plate until the cabinet's

slots fit into the corresponding fixtures on the Base plate.

3. Insert and lock the Locking pins of the Base plate on both

sides.

2. Assembly

d&b Z5396 Rigging manual 1.1 en

5

Advertising