Board exchange, 1 introduction, 2 before installation – Artesyn ATCA-MF106 Installation and Use (September 2014) User Manual
Page 55: 1 requirements, 1 introduction 4.2 before installation, Chapter 4

Chapter 4
ATCA-MF106 Installation and Use (6806800M62B)
55
Board Exchange
4.1
Introduction
This chapter describes how to install the ATCA-MF106 board and includes the following
information:
Before installation
Installing the board in a shelf
Starting up the board
Removing the board
Operation
4.2
Before Installation
This section provides the following information:
Requirements
Unpacking and inspecting the board
4.2.1
Requirements
Before you power up the board, calculate the power needed according to your system
configuration.
The system is shipped with pre-installed ATCA-MF106 boards. You have to observe the
following procedures when ordering a board as a spare part or exchanging a board.
For more information on installing and replacing the ATCA-MF106 board and for a
description of replacement scenarios, see the Centellis 2000 Shelf-DC Installation and Use
manual.