3 required equipment, 2 unpacking and inspecting the board – Artesyn ATCA-MF106 Installation and Use (September 2014) User Manual
Page 58

Board Exchange
ATCA-MF106 Installation and Use (6806800M62B)
58
The board provides two independent power inputs according to the AdvancedTCA
specification. Each input has to be equipped with an additional fuse of max. 90 A located either
in the shelf where the board is installed or the power entry module (PEM).
4.2.1.3
Required Equipment
Gather the following equipment before starting:
Screwdriver
ESD wrist strap
4.2.2
Unpacking and Inspecting the Board
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
Printed user manual
ATCA-MF106
Any optional items ordered
Board Damage
Touching the board or electronic components in a non-ESD protected environment causes
component and board damage.
Before touching boards or electronic components, make sure that you are working in an
ESD-safe environment or wear ESD wrist straps.