Figure 4-1. coordination timing diagram – Basler Electric BE1-50/51B-121 User Manual

Page 38

Advertising
background image

4-2

BE1-50/51B-214/-215/-223/-225 Installation

9252000994 Rev P

From the reset characteristic curve equation.

1

M

RD

T

2

Reset

=

seconds

15.5

1

0

2

7.75

2

=

×

=

M = 0 if current goes to zero.
Negative result indicates reset time.

Results: Full trip = 0.209 seconds and full reset = 15.5 seconds if current goes to zero.

In Figure 4-1,
T

A

= 0.209 seconds (relay was at reset).

T

B

= value < T

A

because rewind has not gone to zero.

T

C

= value < T

A

because rewind has not gone to zero.

Figure 4-1. Coordination Timing Diagram


Equation for time to trip during rewind (before relay is reset).

(

)(

)

Rewind

Full

Time

Rewind

Trip

Full

T

Occurence

This

Trip

=

Second Operation

(

)( )

15.5

3

0.209

T

B

=

seconds

0.040

T

B

=

Third Operation

(

)(

)

15.5

11.96

0.209

T

C

=

seconds

0.161

T

C

=

Advertising
This manual is related to the following products: