Installation of the pc in the control cabinet, Earthing measures – BECKHOFF C6920 User Manual

Page 14

Advertising
background image

Installation Instructions


Installation of the PC in the control cabinet

The C6920/ 25 Industrial PCs are designed for mounting in control
cabinets for machine and plant engineering applications.

The ambient conditions specified for operation must be observed (see
chapter

Technical data

).


Preparation of the control
cabinet

Four holes for the fixing bolts have to be provided in the control cabinet
according to the dimensions of the PC (see chapter

Assembly dimensions

).

Circulation of air

Note

When the unit is installed in an enclosure, adequate space for ventilation
and for opening the PC must be provided.

The clearance above and below the housing must be at least 5 cm in
order to ensure adequate ventilation of the PC.

Avoid extreme environmental conditions

Attention

Extreme environmental conditions should be avoided as far as possible.
Protect the PC from dust, moisture and heat.

The ventilation slots of the PC must not be covered.


Earthing measures

Earthing measures

Earthing connections dissipate interference from external power supply
cables, signal cables or cables to peripheral equipment.

Establish a low-impedance connection from the earthing point on the PC
housing to the central earthing point on the control cabinet wall, in which
the computer is being installed. The earthing connection is located at the
front side of the housing (see photograph on the left).