Base fitting - concrete floor – Blu Bathworks TSP511 User Manual

Page 3

Advertising
background image

2013-07

1 866 907 0122 blubathworks.com

®

2

INSTALLATION

Base Fitting - Concrete Floor

Place the base (2) of the column on the floor. Mark hole locating support.

Drill the floor with the references of the holes of the floor base.

Insert the screw anchors (7) into the floor, position the base (2) and fit the screws (8).

Insert the flexible pipes (1) into the base (2).

Tighten the nuts of flexible pipes (1) to water supply pipes into the floor before installing.
The nut of hot water connection is painted red.

Engage the body (5) on the base (2) and fix with the grub screws (6).

Lower the cylindrical cover (9) and insert it in the seat of the base (2).

Advertising