Base fitting - concrete floor – Blu Bathworks TSP511 User Manual

Page 3

Advertising
background image

2013-07

1 866 907 0122 blubathworks.com

®

2

INSTALLATION

Base Fitting - Concrete Floor

•

Place the base (2) of the column on the floor. Mark hole locating support.

•

Drill the floor with the references of the holes of the floor base.

•

Insert the screw anchors (7) into the floor, position the base (2) and fit the screws (8).

•

Insert the flexible pipes (1) into the base (2).

•

Tighten the nuts of flexible pipes (1) to water supply pipes into the floor before installing.
The nut of hot water connection is painted red.

•

Engage the body (5) on the base (2) and fix with the grub screws (6).

•

Lower the cylindrical cover (9) and insert it in the seat of the base (2).

Advertising