Blu Bathworks TSP511 User Manual

Page 4

Advertising
background image

2013-07

1 866 907 0122 blubathworks.com

®

3

INSTALLATION

Base Fitting - Wooden Floor

Note: Blu recommends adding additional wood blocking under subflooring to support this
fixture on wooden floors.
Note: Screw fixing kit is not supplied for wooden floor installation.

Place the base (2) of the column on the floor. Mark hole locating to support.

Drill the floor with the references of the holes of the floor base.

Insert the flexible pipes (1) into the base (2).

Tighten the nuts of flexible pipes (1) to water supply pipes into the floor before installing.
The nut of hot water connection is painted red.

Engage the body (5) on the base (2) and fixing it with the grub screws (6).

Lower the cilindrical cover (9) and insert it in the seat of the base (2).

FLOOR BLOCKING:

Wooden Floors

1A: Floor Finish

2A: Subfloor

3A: Additional Wood Blocking

Floor

H

C

Joist

1A

2A

3A

Advertising