Step 16 step 17, Step 24, Step 25 – Blu Bathworks TEP431 User Manual

Page 15: Re-fit the processor cover

Advertising
background image

2013-12

1 866 907 0122 blubathworks.com

®

14

Step 24

Re-fit the processor cover.

Step 25

Displ

ay

15V

Battery

AN

Valve

Cont

16

DIGITAL WATER CONTROL AT YOUR FINGERTIPS

Connect the processor power lead to a double pole 3 amp

fuse switched spur incorporated in the fixed wiring circuit, in

accordance with the current wiring regulations.

Important: All showers requiring an electrical

connection MUST be installed by a qualified person

following the latest revision of BS 7671 (Wiring Regulations)

and certified to current building regulations.

Display

15V

Battery

AN

Valve

Cont

Step 16

Step 17

Connect an all-pole mains switch in the
electrical installation in accordance with
the current wiring regulations.

Note:
• the electrical installation and testing must be

carried out by a qualified electrician

• Electrical connections and the minimum

distances between water and electricity
connections must be installed or laid out in
accordance with the valid national regulations.

• Equipment for protection against faulty currents

must be installed (residual current circuit
breaker), N=30mA

• All work on the electronic components must be

only carried out under absence of voltage

Note: Damages to the faucet resulting from incorrect handling and installation are not covered in the manufacturer’s warranty.

Refit the control box cover.

Advertising
This manual is related to the following products: