Venting installation instructions, Continued – Desa CHDV42NRA User Manual

Page 11

Advertising
background image

111906-01C

For more information, visit www.desatech.com

For more information, visit www.desatech.com

11

11

Figure 15 - Horizontal Termination Configuration for Corner Installation Using One 90° Elbow

Square
Termination

Wall
Firestop

Not to Exceed
(H) Limits

As Required for (V)
See Chart for Pipe
Section Required

45°
Elbow

90° Elbow

90° Elbow

Square
Termination

Wall
Firestop

45° Elbow

12" Minimum

CORNER INSTALLATION

Recommended Applications:

• Corner ground floor installation

• Ground floor installation where pipe vents horizontally through wall

(over 12" horizontal pipe)

• Basement installation where one foot clearance from ground to

termination is possible

SNORKEL TERMINATION INSTALLATION

Recommended Applications:

• Installations requiring a vertical rise on building exterior

• Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If
installing snorkel termination below grade, you must provide proper drainage to prevent water from entering snorkel
termination (see Figure 16). Do not back fill around snorkel termination.

VENTING INSTALLATION
INSTRUCTIONS

Continued

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

12"

Minimum

Snorkel
Termination

12"

Minimum

Snorkel
Termination

Wall
Firestop

90° Elbow

45°
Elbow

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

Vertical (V)

Required

Horizontal (H)

Vertical Pipe

46

1

/

4

" min.

None

30" max.

57

1

/

4

" min.

1 ft.

48" max.

69

1

/

4

" min.

2 ft.

60" max.

81

1

/

4

" min.

3 ft.

84" max.

93

1

/

4

" min.

4 ft.

20' max.

Not to Exceed
(H) Limits

12"

Minimum

Snorkel
Termination

Adequate
Drainage

Advertising