CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:
Back, and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top of Standoffs

0"/mm

Vent

(See venting instructions for
specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be
flush with the top front of fireplace .

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows
framing for corner installation. All minimum clearances must be met.

For available accessories for this fireplace, see Accessories on pages
38. If you are using a separate combustible mantel piece, refer to
Figure 6 for proper installation height. You can install noncombus-
tible mantels at any height above the fireplace.

Note:

Noncombustible mantels may discolor!

PRE-INSTALLATION
PREPARATION

Continued

NOTICE: This fireplace is intended for use as supple-
mental heat. Use this fireplace along with your pri-
mary heating system. Do not install this fireplace as
your primary heat source. If you have a central heat-
ing system, you may run system’s circulating blower
while using fireplace. This will help circulate the heat
throughout the house. In the event of a power outage,
you can use this fireplace as a heat source.

Figure 4 - Framing Clearances for Installation Against an Exterior
Wall

C

B

A

D

E

F

G

Top of Louver Opening

3

2

1

4

5

6

7

Wall

A

B

E

F

G

H

D

C

Nailing Tabs

Figure 5 - Framing Clearances for Corner Installation

Ref. Mantel Depth Ref.

Mantel from Top

of Louver Opening

1

14" (356mm) A

16" (406mm)

2

12" (305mm) B

14" (356mm)

3

10" (254mm) C

12" (305mm)

4

8" (203mm)

D

10" (254mm)

5

6" (152mm)

E

8" (203mm)

6

4" (101mm)

F

6" (152mm)

7

2" (51mm)

G

4" (101mm)

Figure 6 - Clearances for Combustible Mantels

PRE-INSTALLATION PREPARATION

Clearances

Framing and Finishing

41

5

/

8

"

21

5

/

8

"

13

1

/

2

"

58

1

/

2

"

16

3

/

4

"

48"

48

1

/

4

"

81

1

/

2

"

40

1

/

8

"

48

1

/

4

"

25

5

/

8

"