Preparation, Ventilation ( ( ( ( ( figure b, Figure b) (figure a) – Caple RiF871 User Manual

Page 6

Advertising
background image

Preparation

Ventilation

Figure B

*Level the kitchen cabinet unit with a spirit level and a try square. Level the unit by placing

packing material underneath if required.

*A minimum gap of 38mm must be maintained at the back of the appliance for ventilation.

*Air inlet A must be at least 200 cm square and air must flow through the panel in the

cabinet plinth.

*Check that the position of the power socket (1) is correct. AC voltage in the location at

which the appliance is to be used must comply with that as shown on the data plate

located on the left inside wall of the appliance next to the vegetable bins. The power

supply must be suitably earthed.

(Figure B)

(Figure A)

5

Advertising