Delta Dore 620 DRIVER Installation User Manual

Driver, Installation guide, Pilot wire programmer

Advertising
background image

DELTA DORE

Bonnemain - 35270 COMBOURG - France

E-mail : [email protected]

*2702120_Rev.1*

DRIVER

Installation guide

Pilot wire programmer

DRIVER 620 - 2 projecting zones

DRIVER 610 - 1 projecting zone

DRIVER

Unit compliant with the requirements of directives:

2004/108/EC (Electromagnetic Compatibility)

and 2006/95/EC (Low-Voltage Safety)

Because of changes in standards and equipment, the characteristics
given in the text and the illustrations in this document are not binding
unless confirmed by our services.

• Carefully read these instructions prior to

installation.

• The unit must be installed in compliance with cur-

rent standards.

• Always switch off the mains before installing or ser-

vicing the unit.

• Do not attempt to repair the unit yourself; an after-

sales service is available.

• Check that the fastenings are suited to

the surface to which the unit will be attached (plas-
terboard, brick, etc.).

• The diagrams provided are simplified for greater cla-

rity. Protections and other accessories required by
standards are not illustrated.
Standard UTE NF C15-100 and good practice must
be complied with. Connected or nearby units must
not generate excessive interference (directive
2004/108/EC).

Warning

Zone 1

Pilot Wire

Convectors

NC

N

L

Connection

DRIVER 610

DRIVER 620

terminal 3

Convectors

zone 1

Convectors

zone 1

terminal 4

NC

Convectors

zone 2

Zone 1

Pilot Wire

Convectors

N

L

Zone 2

Pilot Wire

Convectors

DRIVER 610

DRIVER 620

The room unit must be installed at a height of approxi-
mately 1.5 m, so that it is within arm’s reach for ease
of use.
To attach the unit to
the wall, you must
separate it from its
base. To do so,
unlock the casing.

Unscrew the terminal box cover
and lift it up as high as it will go to block it, then position
the base on the wall

running the wires out through
the hole in the cover.

Secure the base using suitable
screws and screw anchors or fit
onto a flush-mounted box
(distance between centres 60
mm).

Connect the control wires.

Close the box and tighten the
terminal box cover screw.

Room unit mounting.

Output 2 test underway.

Repeat the operations for zone 1.
Check the incorrect connections.
To exit test mode, press the

init button.

Connection of o

u

tp

u

t

2 correct

Connection of o

u

tp

u

t

2 incorrect

OR

The output's number
becomes fixed

The output's
number disappears

Checking the pilot wire connections

Put all of the installation’s convectors on Comfort (with
the set-point on its maximum setting).

When the unit is switched on, a test lasting about 1
minute 30 seconds checks that the outputs are cor-
rectly connected.

If the display remains “normal”, this means there are
no problems.
If a problem exists, the DRIVER displays Pb - - .

Exit

a

nd rel

au

nch

text mode

Choo

s

e the o

u

tp

u

t to te

s

t

L

au

nch the te

s

t

o

u

tp

u

t

b

y o

u

tp

u

t

Approve

a

nd re

s

t

a

rt the te

s

t

for the cho

s

en o

u

tp

u

t

Ex

a

mple: te

s

t for o

u

tp

u

t 2

The first time you activate the unit, you must set
the clock.

Turn the knob to

.

The days flash.

Press + or - to set the day, then OK to confirm and go
to the next setting.
Repeat these steps for the other menus.

To exit the “time setting” mode, turn the selector knob.

Activation

Min

u

te

s

Ho

u

r

s

D

a

y

s

(1: Mond

a

y ...

7:

Su

nd

a

y)

Advertising