4.5.5 Final checks
Check the tightness of all bolts in the suction and
discharge pipe work. Check also the tightness of all
foundation bolts.

4.6 Final shaft alignment check

After connecting piping to the pump, rotate the shaft
several times by hand to ensure there is no binding
and all parts are free.

Recheck the coupling alignment, as previously
described, to ensure no pipe strain. If pipe strain
exists, correct piping.

4.7 Electrical connections

Electrical connections must be made

by a qualified Electrician in accordance with relevant
local national and international regulations.

It is important to be aware of the EUROPEAN

DIRECTIVE on potentially explosive areas where
compliance with IEC60079-14 is an additional
requirement for making electrical connections.

Avoid mechanical, hydraulic or electrical

overload by using motor overload trips or a power
monitor and make routine vibration monitoring.

It is important to be aware of the EUROPEAN

DIRECTIVE on electromagnetic compatibility when
wiring up and installing equipment on site. Attention
must be paid to ensure that the techniques used during
wiring/installation do not increase electromagnetic
emissions or decrease the electromagnetic immunity of
the equipment, wiring or any connected devices. If in
any doubt contact Flowserve for advice.

The motor must be wired up in

accordance with the motor manufacturer's
instructions (normally supplied within the terminal
box) including any temperature, earth leakage,
current and other protective devices as appropriate.
The identification nameplate should be checked to
ensure the power supply is appropriate.

A device to provide emergency stopping must

be fitted.

If not supplied pre-wired to the pump unit, the
controller/starter electrical details will also be supplied
within the controller/starter.

For electrical details on pump sets with controllers
see the separate wiring diagram.

See section 5.3, Direction of rotation

before connecting the motor to the electrical supply.

4.8 Protection systems

The following protection systems are

recommended particularly if the pump is installed in a
potentially explosive area or is handling a hazardous
liquid. If in doubt consult Flowserve.

If there is any possibility of the system allowing the
pump to run against a closed valve or below
minimum continuous safe flow a protection device
should be installed to ensure the temperature of the
liquid does not rise to an unsafe level.

If there are any circumstances in which the system
can allow the pump to run dry, or start up empty, a
power monitor should be fitted to stop the pump or
prevent it from being started. This is particularly
relevant if the pump is handling a flammable liquid.

If leakage of product from the pump or its associated
sealing system can cause a hazard it is
recommended that an appropriate leakage detection
system is installed.

To prevent excessive surface temperatures at
bearings it is recommended that temperature or
vibration monitoring are carried out. See sections
5.7.4 and 5.7.5.

If a defect of cooling can lead to temperature higher
than those acceptable a system of cooling
surveillance must be installed.

Except when explicitly required by the customer in
the specifications, when a possibility of reverse
rotation exists the customer must install a reverse
rotation protection device.

The customer must install all equipment required to
avoid water hammer.