Cooling recommendations for pss ii, Operational recommendations, Zone zone c – Flowserve PSS II Durametallic User Manual

Page 6: Zone b

Advertising
background image

6

Notes for Figure 3:

• Recommendations are for use in water or other similar viscosity liquids.

• These recommendations apply to products having a maximum tempera-

ture of 71°C (160°F).

• On vertical equipment, use Plan 13 to vent the seal area even when

operating in zone B

Cooling Recommendations for PSS II

Figure 3

If the seal runs hot, check for proper seal setting, see Step 7, and check the flush

line for obstructions.

For special problems encountered during installation, contact your nearest

Flowserve Sales and Service Representative or Authorized Distributor.

Operational Recommendations

Do not start up the equipment dry. Vent air from the stuffing box before

startup. Circulate clean product, Plan 11, or a clean fluid from an external source,

Plan 32, through the seal chamber whenever the equipment is in operation un-

less operating in Zone B of Figure 3 where no flush is required.

3600

2700

1800

900

RPM

By-pass flush Plan 11, or

Externa

Not Recommended,

Exceeds PSS II

Speed Limitations

Seal Size

Zone

Zone C

(38.1 to

50.8 mm)

1.500 to

2.000"

(54.0 to

76.2 mm)

2.125 to

3.000"

(79.4 to

101.6 mm)

3.125 to

4.000"

(104.8 to

127.0 mm)

4.125 to

5.000"

(130.2 to

152.4 mm)

5.125 to

6.000"

Flush Recommended to Keep Stuffing Box Clean

No Flush Required for Cooling of Seal, Vent Required

Can be Run Dead-Ended Plan 02

Zone B