Flowserve Valtek Valdisk Control Valves User Manual

Page 3

Advertising
background image

10-3

PREVENTIVE MAINTENANCE

At least once every six months, check for proper operation by

following the preventive maintenance steps outlined below.

These steps can be performed while the valve is in line and,

in some cases, without interrupting service. If an internal

problem is suspected, refer to the ìDisassembly and Reas-

semblyî section.
1. Look for signs of gasket leakage through body and line

flanges. Tighten flange bolting if necessary.

2. Note if any corrosive fumes or process drippings are

damaging the valve.

3. Clean valve and paint any areas of severe oxidation.
4. Check packing box bolting for proper tightness. Packing

nuts should be slightly over finger-tight; however, tighten

as necessary to prevent stem leakage.

CAUTION: Do not overtighten packing.
5. If valve is supplied with a lubricator, check lubricant supply

and add lubricant if necessary.

6. If possible, stroke valve and check for smooth, full-stroke

operation by observing the disc position indicator plate

mounted on the transfer case. Unsteady movement of

the disc could indicate an internal valve problem (jerky

motion is normal whenever Grafoil packing is used).

7. Check positioner calibration by observing the gauges and

the disc position indicator plate. Make sure the positioner

is calibrated to the correct range. Push the positioner

cleanout plunger (Model 80R positioner only) several

times to clear any possible restrictions.

8. Remove transfer case cover plate and make sure the

positioner linkage and internal actuator parts are securely

fastened. Also, check for air leaks through actuator stem

seal, using a soap solution.

CAUTION: Never apply air to the actuator without the

cover plate installed; otherwise, the unsupported shaft

may sustain damage.

9. Be sure that all accessories, brackets and bolting are securely

fastened.

10. If possible, remove air supply and observe stroke plate

for correct fail-safe action.

11. Spray soap solution around the cylinder retaining ring

and the adjusting screw to check for air leaks through

the O-rings.

12. Clean any dirt or other foreign material from the exposed

portion of the shaft.

13. If an air filter is supplied, check and replace cartridge if

necessary.

DISASSEMBLY AND REASSEMBLY
Removing Valve From Line

If an internal problem is suspected with the valve and disas-

sembly is required, remove the valve from the line by proceed-

ing as follows:

WARNING: Depressurize line to atmospheric pressure, drain

all process fluids and decon-taminate the valve (if caustic

or hazardous materials are present). Failure to do so can

cause serious injury.
1. Make sure valve is fully closed.
Note: On valves with fail-open action, air pressure must

be supplied under the actuator piston to close the valve.

If the valve is supplied with a handwheel, it can be used

to close the valve.

2. Attach a hoist or some means to support the valve.
3. Remove the line bolting. Do not attempt to pry line flanges

apart by pushing or pulling on valve actuator.

4. Slide the valve carefully from the line. To avoid damage

to gasket surfaces, do not twist the valve.

Figure 1: Seat Retainer Configurations

NOTE: Item numbers correspond directly to the bill of material. Refer to the bill of material for specific part numbers.

A ñ Dual Seat

B ñ Metal Seat

C ñ Soft Seat

D ñ Seat Insert /

Snap-ring

Advertising