Installation – Flowserve EV 30 User Manual

Page 15

Advertising
background image

15

Installation

Tools

For installation and maintenance work use tools commonly used by fitters and
mechanics.

Dimensions and component parts see Fig. 1 – 4

Installation Materials

The following items are to be provided on site:

Standpipe for gas balance pipe

Support for gas balance pipe

Guide for gas phase valve

Connecting rod between gas and liquid phase valve

Valve mounting flange (unless supplied by GESTRA)

Bottom Valve with Operating Mechanism

see Fig. 2, 3 and 5

1. Weld valve mounting flange on to tank bottom.

2. Weld manifold to operating mechanism .

3. Screw fixing studs for operating mechanism from below into the valve mounting

flange . Put gasket onto the sealing face of the operating mechanism. Attach
gasket and operating mechanism to valve mounting flange by fastening the nuts of
the fixing studs, torque required for tightening 90 Nm.

4. Place tappet guide onto valve mounting flange and pass tappet through

guide.

5. Check correct position of tappet (specified setting 23 ± 0.5 mm) from inside of

tank. When checking, make sure that the lever of the operating mechanism is
at the limit stop.
Limit stop: With the tappet guide inserted it should not be possible to turn the
lever any further in direction of arrow.
If required re-adjust position of tappet by pushing in or pulling out the tappet
until the specified setting is attained.

Attention

After adjusting the tappet fix it firmly to the clevis by fastening the nut on
the tappet (see Fig. 3)

6. Screw fixing studs for the bottom valve inside the tank into the valve mounting

flange . Put gasket and guide onto the seating for the bottom valve and then fit
bottom valve . When putting bottom valve in place make sure that the tappet
extends into the central recess in the valve disc. Tighten nuts in steps to a torque
of 90 Nm.

C

B

B

C

B

4

C

B

3

B

3

B

D

C

D

Advertising