Flowserve EV 30 User Manual

Page 18

Advertising
background image

18

Vent valve and standpipe (internal gas balance pipe)

– continued –

10. Use operating rod to open the vent valve . Fix it in place by inserting a

suitable fixing pin (

4 mm) into the hole above the guide .

Pass connecting rod into the guide pipe of the bayonet base cap and
screw it into the connecting sleeve by turning it to the right until the
adjustment setting 30

±

1 mm is attained. Tighten lock nut , remove fixing

pin and close the vent valve .

Checking the adjustment
The square piece has to protrude 15 + 2 mm from the guide pipe.
It must be easily possible to push the complete operating rod assembly
(connecting rod and operating rod weigh approx. 8 kg) smoothly approx.
6 mm upwards (vent valve does not open yet, i. e. idle lift).

If this is not possible modify the adjustment setting in such a way that the
specified setting (15

+2

mm) is maintained and the idle lift of the valve

(6

±

0.5 mm) is also taken into account. Secure the bayonet base cap by

using hexagon-head bolts M8 x 40 and nuts M8 .

G

W

X

T

R

U

V

G

S

T

W

G

R

P

Q

Advertising