Installation – Flowserve NRG 16-51 User Manual
Page 17
7
Note
n
For the approval of the boiler standpipe the relevant regulations must be considered.
n
Refer to pages 8 for typical installation examples.
n
The angle of inclination of the electrode must not exceed 45°, with the length of the
electrode rod being limited to 000 mm.
Fig. 15
n
For outdoor installations please use level electrode NRG ...-5 F. Level electrodes with
this suffix (F) feature a terminal box made from aluminium.
n
The seating surfaces of the standpipe or the flange provided on the vessel must be
accurately machined, see
Fig. 10
n
Do not bend electrode tip when mounting.
n
Use only the joint rings supplied with the electrode.
NRG 6-5, NRG 7-5, NRG 9-5: 7 x 3, form D, DIN 7603, .430
n
Do not lag electrode body above the hexgonal section.
n
Do not insulate electrode thread with hemp or PTFE tape!
n
Do not apply conductive paste or grease to the electrode thread!
n
Make sure that the air distance between the electrode rod and earth (flange, vessel
wall) is not less than 4 mm.
Fig. 14 – 17
n
Observe the minimum distances for the installation of the electrode!
Attention
Tools
n
Open-end spanner A. F. 3, DIN 30, ISO 338
n
Open-end spanner A. F. 9, DIN 30, ISO 338
n
Open-end spanner A. F. 4, DIN 30, ISO 338
n
Scriber
n
Hacksaw
n
Flat file, medium cut, DIN 76, form A
Installation
– continued –