Installation – Flowserve NRG16-12 User Manual

Page 13

Advertising
background image

3

Important notes

For the approval of the boiler standpipe the relevant regulations must be observed.

For typical installation examples refer to page 4.

When mounting the electrode laterally make sure that the inclination angle does not

exceed 45° and that the length of the electrode rod is limited to 000 mm.

Fig. 12

If the electrode is installed outdoor, it

must be provided with a weather-proof cover

supplied by GESTRA.

Tools

Open-end spanner A. F. 3

Open-end spanner A. F. 36

Scriber

Hacksaw

Flat file, cut 2

Installation

– continued –

Advertising
This manual is related to the following products: