Installation, Commissioning, Operation – Flowserve DK 45 User Manual

Page 11

Advertising
background image



Installation

– continued –

Steam trap with socket-weld ends

. Observe correct position of installation.
. Observe direction of flow. The flow arrow is on the trap body.
. Consider space required for opening trap. When the trap is installed a minimum space of at

least

70 mm is required for removing the cover

C

.

4. Remove plastic plug. They are only used as transit protection.
5. Remove regulator as described in section

Maintenance.

6. Clean socket-weld ends.
7. Apply

only electric arc welding process (welding process  and 4 in accordance with

ISO 406).

Attention

Only qualified welders certified e. g. according to EN 87- may weld the steam

trap into pressurized lines.

The steam trap must

not be insulated.

Heat treatment of welds

A subsequent heat treatment of the welds is not required.

Steam trap with butt-weld ends

. Observe correct position of installation.
. Observe direction of flow. The flow arrow is on the trap body.
. Consider space required for opening trap. When the trap is installed a minimum space of at

least

70 mm is required for removing the cover

C

.

4. Remove plastic plug. They are only used as transit protection.
5. Remove regulator as described in section

Maintenance.

6. Clean butt-weld ends.
7. Apply electric arc welding process (welding process  and 4 in accordance with

ISO 406) or gas welding (welding process  in accordance to ISO 406).

Commissioning

Make sure that the flanged connections of the DK 45 are tightly bolted together and leakproof.

Operation

Certain operating modes of the DK 45 may require servicing. For more information see section

Maintenance.