Installation – Flowserve NRGS 11-1 User Manual

Page 11

Advertising
background image

11

Installation

– continued –

Table 1

NRGS 16 -1 S

9. Check seating surfaces and place flat gasket on connection standpipe.

0. Place blind flange with bore together with level electrode onto connection

standpipe and fix with bolts. Tighten bolts in diagonally opposite pairs. Fig. 4

1

Function

e. g. First low-level alarm

e. g. Feed pump ON

e. g. High level alarm

e. g. Fee pump OFF

Function

Electrode tip

3

4

2

1

Length [mm]

Attention

The seating surfaces of the threads or flange provided on the vessel or
boiler standpipe must be accurately machined. Fig. 5

Do not bend electrode tip when mounting.

Do not lag electrode body.

Note

For the approval of the boiler standpipe with connecting flange the
relevant local and national regulations must be considered.

See four examples of installation on page 19.

Tools

Open-end spanner 41 mm A. F. to DIN 894

Bolt cutter

Hacksaw

Flat file, medium cut

Please enter length and function.

D

Advertising
This manual is related to the following products: