7 installation, 8 electrical interface, 9 setup – Fluke Biomedical 6000-529 User Manual

Page 8

Advertising
background image

Victoreen 6000-529
Operators Manual

1-4

1.7 Installation

Ensure all power is removed prior to installing the
Model 6000-529 Ion Chamber.


Installation of the Model 6000-529 consists of connecting the ion chamber to a Model 4000M+, 4000+,
6000B, 6000M, RAD-CHECK® Plus, or any medical grade electrometer.

The Model 6000-529 may also be used with the Model 6000-531 preamplifier for interfacing with the 4000
or 6000 series of instruments. Refer to the 6000-531 manual for interface details.

A handle is also included with the ion chamber for supporting the ion chamber for in-air measurements.

1.8 Electrical Interface

Final electrical interface connections between the preamplifier, the Ion Chamber, and the host instrument
are listed in Table 2-1.

Table 2-1.

Electrical Interface Connections

Connector Description

BNC Ion

Chamber

Output

HV (BIAS)

Ion Chamber High Voltage

1.9 Setup

Because the Model 6000-529 Ion Chamber may be used with many commercially available electrometers
and dosimeters, please refer to the applicable instrument manual for set up and calibration.

CAUTION

Advertising