Desa 20 User Manual

Page 18

Advertising
background image

18

099623

Pump Rotor

(Procedure if rotor is binding)

1. Remove upper shell (see

page 10).

2. Remove filter end cover

screws using 5/16" nut-
driver.

3. Remove filter end cover

and air filters.

4. Remove pump plate

screws using 5/16" nut-
driver.

5. Remove pump plate.
6. Remove rotor, insert, and

blades.

7. Check for debris in pump.

If debris is found, blow
out with compressed air.

8. Install insert and rotor.
9. Check gap on rotor.

Adjust to .003"/.004"
(.076/.101 mm) if needed
(see Figure 33).

Note:

Rotate rotor one

full turn to insure the gap is
.003"/.004" (.076/.101 mm) at
tightest position. Adjust if
needed.

10. Install blades, pump plate,

air filters, and filter end
cover.

11. Replace fan guard and

upper shell.

12. Adjust pump pressure (see

page 14).

Note:

If rotor is still binding,

proceed as follows.

13. Perform steps 1 thru 6

above.

14. Place fine grade sandpaper

(600 grit) on flat surface.
Sand rotor lightly in
“figure 8” motion four
times (see Figure 34).

15. Reinstall insert and rotor.
16. Perform steps 10 thru 12

above.

Figure 31 - Rotor Location, 8,8/20,5 kW (30/70,000 Btu/Hr) Models

Figure 34 - Sanding Rotor

.003"/.004"
(.076/.101 mm) Gap
Measured With
Feeler Gauge

Figure 33 - Gap Adjusting
Screw Locations

Figure 32 - Rotor Location, 26,4/44 kW (90/150,000 Btu/Hr) Models

Insert

Blade

Rotor

Pump
Plate

Filter End
Cover

Air
Intake
Filter

Air
Output
Filter

Pump
Plate

Insert

Rotor

Blade

Filter End
Cover

Air
Intake
Filter

Air Output
Filter

Fan Guard (26,4
kW [90,000 Btu/
Hr] Model Shown)

Fan Guard
(26,4 kW
[90,000 Btu/
Hr] Model
Shown)

Gap Adjusting
Screw

Rotor

Gap
Adjusting
Screw

Blade

Sandpaper

Advertising
This manual is related to the following products:

26, 8