Induction Dynamics S1.iw User Manual

Page 12

Advertising
background image

10

Audio Perfection Realized

2. There are two speaker wire access holes located at the top of the easy-mount box. The
box comes with a solid grommet preinstalled in the large hole and a small size grommet
preinstalled in the smaller hole. The grommet hole size you will need depends on the size
of the wire you are putting through the hole. In the parts pouch you will find a selection
of large and small grommets that have holes through them of various sizes. Use a grom-
met of the appropriate size to get a snug fit around the speaker wire where it enters the
box. Put a solid grommet in the other hole. Make sure there is enough extra speaker wire
feeding into the box for easy handling of the loudspeaker faceplate.

3. Place the easy-mount box into the mounting hole.

4. Snug the Stud Grabber™ bolts against the left and right wall studs just enough to cause
the easy-mount box to be suspended in the cutout opening. Do not overtighten these
bolts to avoid distorting the studs or box. Make all necessary adjustments to level and po-
sition the easy-mount box in the wall. The preferred method is a small level held against
the inner side of the easy-mount box to make sure it is perfectly vertical. Upon comple-
tion, the box should be level and centered in the cutout opening with the box gasket pro-
truding 1/4” out from the drywall surface.

5. Tighten the Stud Grabber lock nuts with a wrench.

6. Place the 4” stud screws into the hole in the inside of the Stud Grabber bolts. Carefully
pound them in about 1/4” with a hammer to get the threads started. Tighten each of the
screws with a #2 square head screwdriver until the screws are snug.

This assemble consists of an outer flange, inner flange, lock nut, bolt and 4" stud screw.

Stud Grabber Assembly

Advertising
This manual is related to the following products: