Installation, Direct installation on the ceiling – OpenEye CM-410 User Manual
Page 17
Advertising

28561AA
7
INSTALLATION
DIRECT INSTALLATION ON THE CEILING
1. To pass cables to upside of ceiling, cut a 2~2.5 inch
(50~60mm) hole in the ceiling panel.
2. Fasten surface mount bracket to ceiling with 4 screws.
3. Wire cables to terminal block and connect the terminal
blocks to main unit.
4. Fasten main unit to surface mount bracket with 4 lock-up
screws.
5. Remove protective vinyl from dome cover.
Advertising