Watson-Marlow 621CC User Manual

Page 26

Advertising
background image

25 620RE, 620RE4 and 620R CIP and SIP

General

Unlock the guard and disengage the rollers within the tube zone.

Close the guard and squeeze against the track until the latch clicks.

Observe a 1m safety area.

CIP

LoadSure tube elements and continuous tubing can be cleaned using CIP processes.

Ensure that the tubuing material is chemically compatible with the cleaning agent
that is to be used.

If cleaning agents are spilled over the pumphead, wash down immediately.

Ensure that controlled waste pipework is fitted to allow a safe release of cleaning
agent in the event of a tube failure.

SIP

Only STA-PURE tube elements can be used in a steam in place sterilisation processes.

STA-PURE tubing elements can be sterilised to 3A Class two and FDA minimum
recommended standard which is 121C (250F) at 1bar (14.5 psi) saturated steam for
20 minutes.

Monitor the process continuously .

If a tube failure occurs, shut down the process. Do not touch the pumphead until a
20 minute cooling period has been observed.

Ensure a 20 minute acclimatisation period is observed before running the pump
following SIP.

Ensure that controlled waste pipework is fitted to allow a safe release of steam in the
event of a tube failure..

Ensure a 1m safety zone is maintained around the pumphead during SIP cycles.

Ensure that the pumphead door is closed and locked before SIP
cleaning commences.

Page 26 of 46

Watson-Marlow Bredel E-Manuals

21/12/2011

file://R:\staging\pdfs-global\m-621cc-gb-04.html

Advertising
This manual is related to the following products: