10 start-up check list – Watson-Marlow Qdos30 Universal User Manual

Page 16

Advertising
background image

Watson-Marlow qdos30 Universal and Universal+ Pump User Manual

16

10 Start-up check list

• Fit the pumphead to the drive. Refer to: 21 Pumphead replacement on page 69.

• Ensure the pumphead ports are securely fitted to the interface tubing.

• Ensure proper connection has been made to a suitable power supply.

• Ensure that the recommendations in: 8.1 General recommendations on page

13 are followed.

Advertising
This manual is related to the following products: