Westermo ODW-620-F1 User Manual

Page 10

Advertising
background image

10

6651-22621

Designed for harsh environments, such as industrial, road and railway
applications
The ODW-620-F1 complies with standards for industrial environments, railway signalling
and telecommunications apparatus. Additionally the wide temperature range permits it to
be installed in out-door cabinets without any additional measures, such as heating, etc.

System delay in an optical network
Serial data transferred from one ODW-620-F1 via an optical network to a second one,
will be delayed due to the length of optical fibre and the signal processing within the
units. The signal processing delay is dependent on the data rate and conversions, and the
fibre delay is dependent on the total length of the optical fibre.

Item

Functions

Delay

1

Fibre:
Optical fibre length delay (typical)

5 ms/km

2

Converter electrical to fibre:
Signal processing

0.6 ms (CTS mode)
1 t

Bit

+ 0.6 ms

(CTS/RTS mode)

3

Converter fibre to electrical:
Signal processing

0.6 ms

Note t

bit

= 1 / Baud rate (Baud rate in bit/s)

The system delay when transferring data from the serial input at one ODW-620-F1 to
the serial output of other one is calculated by adding the following:
1. Fibre: The optical fibre length delay.
2. Converter electrical to fibre: Signal processing delay.
3. Converter fibre to electrical: Signal processing delay.

Example 1: Data data transfer from one ODW-620-F1 to a second

converter with a total fibre length of 25 km. Data rate of 9 600 bit/s.

1. Fibre: The total optical fibre length delay 25 * 5 ms = 125 ms.
2. Converter electrical to fibre: Signal processing delay 1 t

bit

+ 0.6 ms = 105 ms + 1.0 ms

= 106 ms.

3. Converter fibre to electrical: Signal processing delay = 0.6 ms.
4. The system delay is calculated by adding the delays in items 1 to 3 above = 232 ms

Example 2: Data transfer from one ODW-620-F1 to a second converter

with a total fibre length of 25 km. Data rate of 9 600 bit/s.

5. Fibre: The total optical fibre length delay 25 * 5 ms = 125 ms.
6. Converter electrical to fibre: Signal processing delay = 0.6 ms.
7. Converter fibre to electrical: Signal processing delay = 0.6 ms.
8. The system delay is calculated by adding the delays in item 1 to 3 above = 126 ms

Advertising
This manual is related to the following products: