Preparing for installation

Safety recommendations

WARNING!

Before installation and operation, read all of the safety instructions in

Compliance and Safety Guide

supplied with your router.

Follow these general safety recommendations:

•

Turn off all power and remove all power cables before opening the chassis.

•

Unplug all power and external cables before moving the chassis.

•

Before installation, locate the emergency power switch so that you can shut off power
immediately if necessary.

•

Always wear an ESD wrist strap when installing the router.

•

Do not stare into an open optical interface. The light can cause permanent eye damage.

•

Use a good grounding system. This is essential for reliable operation.

•

Confirm that the resistance between the chassis and the ground is less than 1 ohm.

Site requirements

The router can only be used indoors.
This section provides information about temperature, humidity, cleanness, and air quality requirements,
as well as rack-mounting requirements and protection against damage from lightning and EMI.

Table 1 Temperature and humidity requirements

Temperature Relative

humidity

0°C to 40°C (32°F to 104°F)

5% to 90%

Table 2 Dust concentration limit in the equipment room

Substance

Concentration limit (particles/m

3

)

Dust particles

≤ 3 x 10

4

(No visible dust on desk in three days)

NOTE:

Dust particle diameter ≥ 5 μm

Table 3 Harmful gas concentration limits

Gas Max.

(mg/m

3

)

SO

2

0.2

H

2

S 0.006