Grass Valley Cobalt v.1.14 User Manual
Page 15

Cobalt User Manual- document version: 3.0 – Page 15
5.11 Editing an Event
To edit an Event, double-click the Event you want to edit. This will open the Edit Main Event window.
In this window you can edit the Event's
Start date and time
TC in and out
Duration.
Type (fixed, follow on and manual)
Name
The Asset Status box will show status information and error messages.
'Import fields' relates to information imported from an external source such as the Schedule. By double
clicking in this field you can replace, add and remove certain aspects depending on the Schedule, for
example:
Subtitles External Reference Ids
Clip/file names for logos
The main box shows the main Event's sub events.
5.12 Adding Assets from TX/MAM to POC to create Events
You can drag and drop Assets from TX/MAM into POC to create Events. The Event is scheduled with
the default Format. You can modify the Events Formats as described in paragraph 5.10.