Unpacking the chassis, Installing the rack mounts, Unpacking the chassis installing the rack mounts – Grass Valley K2 Level 3 RAID Dec.09 2005 User Manual
Page 28

28
Level 3 RAID Instruction Manual
November 23, 2005
Chapter 2 Level 3 RAID Installation Information
Installing a K2 Level 3 RAID Storage in an
equipment rack
Use the information in this section to unpack the K2 Level 3 RAID Storage chassis
and mount in an equipment rack.
Procedures include:
•
•
•
“Inserting the K2 Level 3 RAID Storage chassis in the rack”
Unpacking the chassis
Unpack the Level 3 RAID chassis, cables, and installation kit, as illustrated by the
diagram on the outside of the packing box.
CAUTION: A Level 3 RAID chassis is heavy. Two people
should lift and move it.
NOTE: Save the chassis packaging. Use only K2 approved packaging to ship.
Installing the rack mounts
The following diagram and procedure describe installing the right side rail.
Installation is similar for the left side rail.
!