Interpreting expansion adapter status leds, Interpreting, Chapter 3 servicing the level 3 raid – Grass Valley K2 Level 3 RAID Dec.09 2005 User Manual
Page 42
Advertising

42
Level 3 RAID Instruction Manual
November 23, 2005
Chapter 3 Servicing the Level 3 RAID
Interpreting expansion adapter status LEDs
Use the following illustration and table to identify and interpret expansion adapter
LEDs
LED
Action
Meaning
Ready
(Green)
On
Module is powered on and initial diagnostics completed normally
Fault
(Orange)
On
Fault in the module.
Also on at power-on and then off at the completion of the self-test.
Linkup
LED
(Green)
On
Fibre Channel In port (from primary RAID chassis) is operable and linked
up.
Off or
flashing
Self-test or initialization just after power-on.
(4) LINKUP LED
(6) Ejector
(1) READY LED
(2) FAULT LED
(3) FC connectors
(FC-IN/FC-OUT)
(5) ENC ID switch
Advertising