Cabling and control, Cabling, Abling and – Grass Valley KayakDD-1 Installation User Manual
Page 50: Ontrol, Figure 15, Kayakdd-1 standard cabling, 7 cabling and control, 1 cabling
Advertising

KayakDD-1 Digital Production Switcher
6.7 Cabling
and
Control
6.7.1 Cabling
The cabling of a standard KayakDD-1 application is illustrated in figure below.
USB
P/S 2
3
4
REFERENCE
Control Panel
Video Processor Frame
AC Power Supply
110-240V
DC Power Supply
48V (Redundancy)
DC Power Supply
48V
alternatively
Keyboard
Mouse
Note:
Keyboard and Mouse not
mandatory and not supplied.
CAT5 Crossover Cable
Supplied DC interconnection cable
Note:
The KDD-PSU Power Supply Unit for redundancy contains only one DC cable (5 m).
Additional cables must be ordered separately!
Figure 15
KayakDD-1 Standard Cabling
Planning and Installation Manual
49
Advertising