Cycle run – HEIDENHAIN iTNC 530 (340 49x-06) Cycle programming User Manual

Page 109

Advertising
background image

HEIDENHAIN iTNC 530

109

4.3 RIGID T

A

PPING without a Floati

ng T

a

p Holder NEW (Cy

c

le 207

,

DIN/ISO:

G207)

4.3 RIGID TAPPING without a

Floating Tap Holder NEW (Cycle
207, DIN/ISO: G207)

Cycle run

The TNC cuts the thread without a floating tap holder in one or more
passes.

1

The TNC positions the tool in the spindle axis at rapid traverse FMAX
to the entered setup clearance above the workpiece surface.

2

The tool drills to the total hole depth in one movement.

3

Once the tool has reached the total hole depth, the direction of
spindle rotation is reversed and the tool is retracted to the setup
clearance at the end of the dwell time. If programmed, the tool
moves to the 2nd setup clearance at FMAX.

4

The TNC stops the spindle turning at setup clearance.

Advertising
This manual is related to the following products: